Dispense Proof Logo

A PERFECT PINT IS ONLY AS GOOD AS THE SYSTEM BEHIND IT.

Independent draught system surveys and quality assurance audits for the UK licensed trade.

We work with contractors, breweries, wholesalers, and venues to ensure every installation is safe, compliant, and set up for the perfect pint.

REPORTS WITHIN 48 HOURS
15+ YEARS IN DRAUGHT DISPENSE
FOUNDER-LED INDEPENDENT VIEW

WHERE DISPENSE PROOF FITS

Installations rarely fail because of one dramatic fault. They fail because readiness, routing, sign-off, and follow-up were not checked clearly enough at the right moment.

BEFORE WORK STARTS

Cellar layout, python routes, access, and utilities are checked before an install team arrives on site.

DURING HANDOVER

Workmanship, standards, and visible snagging points are recorded so the handover is based on evidence.

WHEN FAULTS DRAG ON

A neutral technical view helps separate system issues, site constraints, and operator concerns.

AFTER INSTALL

Follow-up checks help confirm the system is still pouring as intended once the venue is trading.

SERVICES

Practical support for the points in a draught project where a clear independent record saves time, protects standards, and keeps everyone aligned.

  • Pre-install surveys
  • Post-install audits
  • Snagging and evidence reports
  • Follow-up quality checks

PRE-INSTALL SURVEYS

Site checks before work starts, focused on readiness, layout, access, and anything likely to slow the install.

  • Cellar readiness & space audit
  • Python routing & layout planning
  • Power & infrastructure review
  • Comprehensive photographic reporting
SCOPED AFTER ENQUIRY

POST-INSTALL AUDITS

A structured review after installation, giving both sides a clear record of workmanship, standards, and snags.

  • Standards verification
  • Photographic snagging report
  • Operator sign-off docs
QUOTED TO SITE & SYSTEM

SURVEY + AUDIT

A joined-up check before and after installation, useful when the install needs a clean evidence trail from planning to handover.

  • Pre-install survey
  • Post-install audit
  • Combined reporting and recommendations
SURVEY + QA BUNDLE

FOLLOW-UP CHECKS

Return visits and review support once the venue is trading and real-world dispense performance can be assessed.

  • Post-install review visits
  • Standards guidance
  • Ongoing quality assurance support
ONGOING SUPPORT AVAILABLE

THE PROCESS

A short route from enquiry to site review, report, and next steps. No bloated process, just the checks needed for the job in front of us.

01

ENQUIRY & SCOPE

Share the site, system, and concern so the right level of support can be confirmed.

02

ON-SITE ASSESSMENT

Targeted checks on layout, installation quality, dispense performance, and handover risks.

03

EVIDENCE-BASED REPORTING

Photographic findings and practical actions delivered in a clear report.

04

RESOLUTION

Follow-up where needed to review remedial work and close the loop.

READY TO DISCUSS YOUR SYSTEM?

Send the site details, the system type, and what needs checking. You can also email direct if that is easier.